Keep your old power meter, for a fee

People who insist on refusing smart meters can keep their old mechanical meter as long as it lasts, cost to be determined

A smart meter installer photographs a sign posted to refuse replacement of mechanical power meter

VICTORIA – People who insist on refusing new wireless electrical meters can keep their old mechanical meter as long as it lasts, if they pay a monthly fee, Energy Minister Bill Bennett announced Thursday.

Customers can keep their mechanical meters until they break down, their Measurement Canada accuracy seal expires or the customer relocates, the ministry said in a statement.

The mechanical meter option is added to an earlier compromise with BC Hydro customers who still don’t have a digital smart meter, which transmits power consumption and status via radio signals. Customers can have a digital meter with its transmission function turned off, or keep their old meter, as long as they pay the cost of having the meter read manually.

Bennett said the cost of meter reading will be about $20 a month. Customers who accept a deactivated smart meter will also pay a fee of about $100 to have it adjusted.

The fee to keep a mechanical meter will be higher, because it will require a separate system to manually record and bill for power consumption, Bennett said.

NDP energy critic John Horgan said he is pleased that the proposed fees will be reviewed by the B.C. Utilities Commission before being implemented. The opt-out provision should have been made available from the start, instead of rushing to meet the government’s artificial deadline to install smart meters, Horgan said.

BC Hydro reports that 60,000 smart meter installations have been delayed due to customer requests, while 1.8 million or 96 per cent of customers now have a functioning smart meter.

Some people persist in the belief that the radio signals from smart meters are a health hazard, despite the fact that the periodic meter signals represent a tiny fraction of the radio frequency exposure from a mobile phone call.

Bennett said mechanical or “analog” meters are obsolete, and eventually every customer will have a smart meter, whether it is set to transmit or not.

“Bear in mind, when somebody’s analog meter wears out, stops working or comes to the end of its useful life, there are no analog meters to reinstall,” Bennett said. “You can’t buy them anywhere.”

 

Just Posted

Delays en route for Highway 7 in Harrison Mills

Road resurfacing will cause month-long delays for drivers travelling through Harrison Mills

The luckiest man in Agassiz finds more than 200 four-leaf clovers

Walt Hardinge has found more than 219 four-or-more leaf clovers this spring alone

Chilliwack’s pediatric observation unit gets financial shot from trades workers

Unions and contractors donate more than $30,000 to Fraser Valley Health Care Foundation

Missing Chilliwack man not heard from since January

Kristopher Shawn Couture, 25, last made contact with family from Edmonton

Two week lock down lifted for Kent Institution

A search at the prison found nearly 26 grams of hashish and a cellphone

VIDEO: Quadriplegic man takes flight over Harrison Mills

Jim Ryan hasn’t moved his arms or legs for three years, but that didn’t stop him from paragliding

CMHC defends mortgage stress test changes amid calls for loosening rules

Uninsured borrowers must now show they could service their mortgage if rates rose two per cent

Metro Vancouver mayors ask public to lobby feds for annual $375M transit fund

Mayors renewing their call for transit funding as federal election looms

B.C. woman left ‘black and blue’ after being pushed off 40-foot cliff at lake

West Shore RCMP looking for witnesses as investigation continues

BC Ferries asks boaters to learn signals and be careful around vessels

BC Ferries responded to 15 marine emergencies in 2018

VIDEO: Suspected arson sends five to Abbotsford hospital with smoke inhalation

Man seen throwing flammable substance in van, lighting it on fire next to home

Thunderstorms to bring heavy rain, risk of flash floods in the southern Interior

Ten to 30 millimetres of rain to fall over the early weekend

Mother bear, three cubs relocated from Maple Ridge

Silver Valley residents calling for ‘no-kill’ zone.

VIDEO: TransLink to roll out battery-powered bus pilot this summer

Four buses will run a 2.5 year pilot along Marine Drive

Most Read