Metro's existing waste-to-energy plant in south Burnaby was built as a design-build-operate P3 but a new incinerator could be developed with a private financing role as well. Photos below: Delta Mayor Lois Jackson

Metro starts down P3 road for new waste incinerator

Private financing of WTE pledged to qualify for federal grant

Metro Vancouver’s proposed waste-to-energy project may end up being privately financed if the regional district’s application to Ottawa for federal funding as a private-public partnership is approved.

The application for P3 Canada funding has split directors on the regional board, with some warning that building a new incinerator as a P3 could dramatically drive up the costs for taxpayers.

Delta Mayor Lois Jackson said the situation is reminiscent of the Canada Line, where private investors borrowed the money to build the $2-billion rapid transit line  at much higher interest rates than if it had been publicly financed.

She noted the region gets favourable interest rates through its membership in the Municipal Finance Authority.

“I have no problem with doing a P3 for design-build,” Jackson said. “But finance I think is not a wise choice. All that money and interest has to be paid back and the taxpayer ends up paying back a higher rate of interest.”

P3 Canada-eligible projects must give the private partner not just a design-build role but also one of either operating, maintaining or financing it.

Metro’s application proposes a design-build-finance-operate P3, because projects with the most private sector involvement are expected to be preferred for funding.

Board vice-chair Richard Walton supported the decision, saying Metro won’t yet be bound to that model and could revise it later.

Metro staff and consultants are still determining a recommended business model for the new plant ahead of a call for proposals from potential partners.

But Walton said the region had to apply by June 15 to have a shot at a grant.

“My view is you keep all those doors open going forward,” he said.

The P3 Canada fund is to distribute more than $525 million by the end of 2013, with grants limited to 25 per cent of a project’s capital cost.

Metro’s current waste-to-energy plant in south Burnaby was developed as a design-build-operate P3, with the region financing it and retaining ownership.

Metro Vancouver still must carry out extensive studies and consultation with the Fraser Valley Regional District, where there are concerns a new incinerator would worsen air quality in the constrained airshed.

Metro is also far from deciding where a new waste-to-energy plant might be built and whether it uses conventional incineration or some alternative technology.

The region downsized the plan earlier this year, estimating it now needs extra disposal capacity of 250,000 to 400,000 tonnes per year – down from 500,000 to 600,000 – in light of declining garbage volumes.

The Metro application will have at least one more local competitor for the same pool of federal money.

The City of Surrey is also applying to the P3 Canada fund to help finance an organic biofuels plant it plans to build to serve the region at Metro’s Port Kells transfer station.

Just Posted

Fraser-Cascade school district hosts by-election to fill void left by passing of Tom Hendrickson

Advance voting begins on July 17, with general voting on July 27

Okan brings Cuban rhythm to Harrison Festival of the Arts

The Cuban band from Toronto will be performing a concert and holding a workshop

Sts’ailes drum making coming to Harrison Festival

The workshop has been happening for years, bringing Indigenous teachings to the festival

Transparency, dialogue key to UBC Dairy’s open house

The annual Agassiz event invites the public to come learn about dairy farming and research around it

Chilliwack lagging real estate sales mirrors provincial trend

Forecast for 2019 is a drop from 2018 but a bounce back predicted for 2020

VIDEO: Agassiz remembers local officer at grave-marking ceremony

Montague White-Fraser had been buried in the Old Cemetery for 92 years without a headstone

Report of dead body in B.C. park actually headless sex doll

This discovery, made at Manning Park on July 10, led police to uncovering two other sex mannequins

Grand Forks fire chief found to have bullied, harassed volunteer firefighter: report

WorkSafeBC, third-party human resources investigation looking into allegations complete

Dog recovering after being drenched in hot coffee, B.C. man charged

Man was taken into custody, charged, and released pending a court date

Taekwondo instructor, 21, identified as B.C. bat rabies victim

Nick Major, 21, an instructor at Cascadia Martial Arts in Parksville

Science expedition to Canada’s largest underwater volcano departs Vancouver Island

Crews prepared for a two-week research mission to the Explorer Seamount

B.C. shipyard to get one-third of $1.5 billion frigate-repair contract

The federal government has promised to invest $7.5 billion to maintain the 12 frigates

Worried about bats? Here’s what to do if you come across one in B.C.

Bat expert with the BC Community Bat Program urges caution around the small creatures

B.C. on right road with tougher ride-hailing driver rules, says expert

The provincial government is holding firm that ride-hailing drivers have a Class 4 licence

Most Read