(Black Press Media files)

New contract to double speed of snow removal on Coquihalla highway

Snow must be cleared within 24 hours, not 48 hours

The Coquihalla will soon be cleared of snow more quickly as a new maintenance contract comes into effect this summer.

Currently, the region is cared for by VSA Highway Maintenance, whose contract will run out on June 31.

Yellowhead Road and Bridge will take over the contract, which comes with “even higher standards” for snow clearing, according to the transportation ministry.

In a statement Monday, the ministry said Class A highways (including the Coquihalla) will need to be cleared to “bare pavement within 24 hours of a winter weather event ending at pavement temperatures of -9 C or warmer.”

The previous rules indicated 48 hours until roads had to be clear of snow.

The new contractor will also have to patrol all Class A highways every 90 minutes, instead of every four hours, during a winter storm.

READ MORE: Loose dog on Coquihalla Highway has been saved


@katslepian

katya.slepian@bpdigital.ca

Like us on Facebook and follow us on Twitter.

Just Posted

Life rings, signs to improve safety on Harrison waterfront

Harrison council approved $125,000 in aquatic safety projects for the beach

PHOTOS: Harrison students take on the Bunny Run

Harrison Hot Springs Elementary students dressed up for the Easter event

No more mobile vendors on Harrison beach

The approval of an updated business licence bylaw means Nolan Irwin is without a cart

Chilliwack PEO: ‘We who are sisters’

International oganization celebrating 150 years of service

Chilliwack students take the lead as mental health advocates

About 100 Chilliwack youth prepped to make a difference during Mental Health Week

VIDEO: Agassiz, Harrison celebrate National Pet Day

From cats and dogs to lizards and chickens, residents showed off the animals that enrich their lives

Kirkland Signature veggie burgers recalled due to possible metal fragments

Recalled products came in 1.7 kg packages with a best before date of Apr. 23, 2019

Chaos at the ferry terminal for people heading from Vancouver to the Island

Easter crowds create backlog at Tsawwassen ferry terminal

Parents of 13 who tortured children get life after hearing victims

One of their daughters fled their home and pleaded for help to a 911 operator

Crews battle Burnaby blaze; 2 people sent to hospital

Emergency Support Services helping residents displaced by fire

Flooding, climate change force Quebecers to rethink relationship with water

Compensation for victims of recurring floods limit to 50% of a home’s value, or a maximum of $100,000

Storms blast South, where tornadoes threaten several states

9.7 million people in the Carolinas and Virginia at a moderate risk of severe weather

Private cargo ship brings Easter feast to the space station

There are three Americans two Russians and one Canadian living on the space station

Notre Dame rector: “Computer glitch” possible fire culprit

The fire burned through the lattice of oak beams supporting the monument’s vaulted stone ceiling

Most Read